

On May 25, 2017, by a 12-0 vote, the Metro Board of Directors approved directing the SR-710 project funds to local operational improvement projects to address traffic congestion caused by the 4.5-mile gap in the 710 freeway between Alhambra and Pasadena. Under the motion approved by the Board, $105 million from Measure R would be used for local improvements listed in the Transportation System Management/Transportation Demand Management (TSM/TDM) option in the environmental document including: traffic signal upgrades and synchronization, local street and intersection improvements, improved connections to existing bus service and the promotion of rideshare in the area. The remaining Measure R funds could be used for other mobility improvement projects that can alleviate congestion on local streets along the SR-710 corridor.
The SR 710 North Study undertaken in 2011 explored solutions to traffic congestion caused by the freeway gap. The project’s environmental study looked at five alternatives: a “no build” option, a freeway tunnel, light rail, bus rapid transit and TSM/TDM. The Study results indicate that the alternative that best addresses the project’s purpose and need is the Single Bore Freeway Tunnel.
While the Metro Board adopted the TSM/TDM as the Locally Preferred Alternative, the decision on a Preferred Alternative will be made by Caltrans later this year.
We are able to provide high-quality political journalism to you for free thanks to our advertisers. So that you can continue to enjoy HEYSOCAL's in-depth reporting, we ask that you please turn off your ad blocker and come on in, free of charge.
Subscribe to our newsletter for this giveaway and many more. Also, stay in the loop for SoCal news and updates.
Your subscription has been confirmed. You've been added to our list and will hear from us soon.
Your request has been confirmed! We will get in touch with you shortly.